Reverse Osmosis Unit for brackish water treatment installed on a stainless steel scaffolding with a capacity of 207 m3 / day.
GREENHOUSE
Project
- Company: Greenhouse
- Industry: Unit
- Started: 18/01/2022
- Area: Ierapetra, Crete
- Activity type: Water Treatment
- Delivered: 26/03/2022
Project
Description
Qualitative and economic installation details
The reverse osmosis unit has been dimensioned to produce 9m3/ h and run 23 hours a day. The installation of the equipment has been done on a stainless-steel scaffold and in specific dimensions (customize) for the installation needs. The design has been based on the fact that the water produced meets the increased requirements of hydroponics.
Electrical conductivity of finished produced water: 650-800 (μs / cm).
Hardness in German grades of finished produced water: 4 -5 (od).
System recovery rate: 72% (relationship between raw water and final product).
Cost of water production per cubic meter: ~ 0.18€/m3 (Including cost of electricity, consumables and chemicals, yearly maintenance and replacement of polyamide membranes at 5 years).
Gallery