Water treatment unit with 3-stage reverse osmosis unit installed on stainless steel metal scaffold.
NAVIS
Project
- Company: NAVIS
- Industry: Hotel - 4 stars
- Started: 18/01/2022
- Area: Heraklion, Crete
- Activity type: Water Treatment
- Delivered: 26/03/2022
Project
Description
The installation of the equipment has been made on a stainless steel scaffold and in custom dimensions for the installation needs. The unit features a touch screen with a mimic diagram and a remote monitoring system for direct user supervision. The design was based on the fact that the water produced would be suitable for human consumption.
Qualitative and economic installation details
Electrical conductivity of finished produced water:(μs / cm).
Hardness in German grades of finished produced water:(od).
System recovery rate: % (relationship between raw water and final product).
Gallery