Upgrading hotel in the waste station.
ATLANTICA
CALDERA PALACE
Project
- Company: Sensatori Atlantica Caldera Palace
- Industry: Hotel - 5 stars, 1200 beds
- Started: 18/01/2022
- Area: Heraklion, Crete
- Activity type: Water Treatment
- Delivered: 26/03/2022
Project
Description
Reconstruction of hydraulic networks in waste facilities.
Replacement of power and automation panels.
Installation of new waste pumps, automatic suction of solids.
The benefits of installing after upgrading
The new pumps from Gorman-Rupp have the advantage of being easily inspected by special visiting doors. The impellers are of the open type which allows the passage of large solids. It is a surface with automatic suction without foot valve from the 7 meter water column.
Reliable system operation with standard industrial equipment.